Tarmac Driveway, Full Dig-Out
The Brief: Worn surface breaking up at the edges, weeds coming through the middle of the existing layout.
What We Did: Full excavation of the site, installed a heavy-duty geotextile membrane, compacted a fresh Type 1 sub-base, and laid a two-course machine-laid tarmac finish with a solid new edge restraint.